
News
PLP - A Major Supplier of Busbar Systems to the Australian Market
Preformed Line Products has been manufacturing full, turnkey, integrated substation bus systems since 2000 ranging from 22kV to 500kV. Fully prefabricated systems have been installed which eliminated the need for on site welding, the fully bolted system having obvious advantages.
PLP’s product range caters to all standard tube sizes including 80, 100, 125, 160 and 200mm diameters with wall sections from 3 to 12 mm. As part of PLP’s service to our customers we offer a maintenance manual with all substations including the following;
1. Quality Assurance Documentation.
2. Assembly Instructions.
3. Elevation and General Assembly Drawings.
4. Rigid Busbar Drawings.
5. Rigid Busbar Identification Label.
6. Component Drawings.
7. Detailed Packing List.
8. Material Certifications.
9. Welder Certifications.
10. Welding Procedures.
11. Insurance Certificates.
Bolted “A” Frame
PLP manufacture a bolted A frame design for connecting the high and low busbars where the welding is conducted in the factory and the A frame is located and bolted together on site.
Compression Terminals
Compression terminals are made for use on aluminium based stranded conductors for AAC, AAAC and ACSR. The palms are designed to suit the terminals on equipment manufactured to AS62271.301 (formally AS2395). PLP can also manufacture to customer requirements.
Corona Control Fittings
PLP manufacture corona rings for both substations and high voltage transmission lines. These are either manufactured to a proven design or, by using our finite element analysis software, we can design and manufacture grading rings to suit individual applications.
Flexible Connections
Laminated: Designed for connections where expansion of the busbar is required. Manufactured from sheet aluminium laminations shaped to allow for expansion. These are welded to aluminium.
Conductor: Manufactured with the same purpose in mind, these connections are manufactured from a combination of conductor and compression terminals.
Flexible Droppers
Another option for the connection of high and low bus, is to use standard compression terminals with a length of conductor. These can be compressed in the factory (if an accurate length is known) or easier on site.
Bolted Fittings
These fittings are designed to terminate and connect both rigid aluminium busbars and strung conductor bus. All PLP Bolted fittings are manufactured using high strength Aluminium Alloy with stainless steel hardware.
Spacers
Designed for holding conductors at predetermined positions the PLP spacers come in a variety of spacings ranging from 50mm to 520mm as well a large range of conductors. These spacers are
either forged or cast using high strength alloys depending on thespacing.
Earth Fittings
PLP manufacture a range of substation working earths to cover solid bus, as well as strung bus in single, double, triple or quad configurations.
Click here to download Substation Brochure
Click here to download Substation Catalogue (2009)

News Archive
- 18 May 2010PLP ANNOUNCES AGREEMENT TO ACQUIRE ELECTROPAR LIMITED
- 1 March 20102010 Communications Catalogue Launch
- 23 December 2009Preformed Line Products Announces Completion of Its Acquisition of The Dulmison Business
- 1 December 2009PLP FibreformX Cross Arms Ready for Field Trial
- 5 September 2009Energy 21C - 2009 AMDTs Launch
- 4 September 20092009 Transmission Catalogue Launch
- 2 July 20092009 Distribution Catalogue Launched!
- 2 March 2009PLP Launches Amorphous Metal Distribution Transformers in Australia
- 9 February 2009PLP’s New Substation Catalogue Launches 09”
- 16 November 2008PLP - A Major Supplier of Busbar Systems to the Australian Market
- 13 November 2008Single Phase To 3 Phase Converter
- 18 August 2008Bluesky Energy Exhibits it's Solar Products
- 5 June 2008PLP enters the Renewable Energy Market
- 5 May 2008Upcoming Phaser3 Exhibitions
- 24 April 2008Agro Trend Field Day 2008
- 30 November 2007Energy21C 2007 - New Composite Cross Arm and Phaser3 Release
- 12 November 2007Chicago Nights Cabaret
- 27 September 2007Complimentary VORTX Placement Schedule
- 24 September 2007Major Supplier of Busbar Systems to Australian Market
- 10 August 2007PLP Corona Analysis Service
- 23 April 2007Preformed Line Products acquires Belos S.A.
- 30 July 2005Turning the First Soil
- 20 July 2005SSD Field Trial
- 6 July 2005Safety Service Disconnector
- 5 July 2005Energy Australia Recognition
- 1 July 2005PLP wins Aurora Supplier of the Year
- 29 July 2004PLP Embraces Accelerated Product Development
- 19 July 2004Turnkey Substation Anchors
- 6 July 2004Fibre to the Home
- 4 July 2004PLP's New Operation in Asia
- 21 October 2002Dedicated Queensland Sales Office in Brisbane
- 10 October 2002PLP Wins Export Award AEEMA
- 7 September 2002Country Energy says Thanks
- 3 September 2002PLP Awarded for Excellence
- 23 August 2002PLP Celebrates 40 Years
- 7 August 2002Mobile Training with PLP
- 26 December 2001PLP-100% Australian
- 25 December 2001D2001 Exhibition
- 20 August 2001PLP Re-Invest in Australian Manufacturing
- 15 August 2001Molong Substation
- 4 August 2001PLP-a growing success in Asia
- 25 November 1999New Product - Coyote Runt fibre optic closure
- 18 November 1999PLP's KGK Lasco drop forge hammer
- 12 November 1999Advance Energy and PLP
- 6 July 1999Pro-Engineer Proves its worth
- 2 July 1999New Product- ABC Service Terminations
- 1 July 1999PLP Enters the Data Communications Market