News
Turnkey Substation Anchors
Preformed Line Products has been manufacturing full, turnkey, integrated substation systems since 2000. Our long history in supplying quality high voltage hardware and fittings gave a solid foundation for our advancement into substation system supply. Customers can be well assured the manufacturing quality and engineering backup synonymous with PLP products applies equally to our substations.
Our engineering team have helped design turnkey substation packages and components ranging from 22kV to 500kV. Their involvement in the process from design and estimation, right up to final manufacture, guarantees a high quality engineered product.
PLP substation fi ttings are designed with the installation contractor in mind. As much work as practical is completed in house prior to shipping to site. Fully prefabricated systems have been installed which eliminated the need for on site welding, the fully bolted system having obvious advantages. Installation of the system is simplifi ed by provision of a marked up site layout drawing with all bar locations clearly noted.
Our product range caters to all standard tube sizes including 80, 100, 125, 160 and 200mm diameters with wall sections from 3 to 12 mm. The growth in demand for PLP substation systems lead to the recent addition to our Glendenning facility of a 30m busbar welding bay.
The new bay includes MIG and TIG in both steel and aluminium operated by qualifi ed welders approved by all local EHV authorities. It also allows us to handle busbars up to 16m long, ordered in single lengths from the tube manufacturer, at the limits of normal road freight.
Full package supply orders are commonly requested from us. In one shipment we can supply all:
- fittings for the overhead strung bus including terminations, spacers, jumper and dropper terminals and steel hardware.
- compression terminals for the flexible bus connecting the transformers, CVT’s and disconnectors, etc to the system.
- busbar roller and fixed supports including fasteners for the whole system.
- fully fabricated busbars with bonded dampening conductor, terminal palms and support fittings.
Why not put us to the test and contact the office with your next substation project and allow us the opportunity to demonstrate our capabilities first hand.
News Archive
- 18 May 2010PLP ANNOUNCES AGREEMENT TO ACQUIRE ELECTROPAR LIMITED
- 1 March 20102010 Communications Catalogue Launch
- 23 December 2009Preformed Line Products Announces Completion of Its Acquisition of The Dulmison Business
- 1 December 2009PLP FibreformX Cross Arms Ready for Field Trial
- 5 September 2009Energy 21C - 2009 AMDTs Launch
- 4 September 20092009 Transmission Catalogue Launch
- 2 July 20092009 Distribution Catalogue Launched!
- 2 March 2009PLP Launches Amorphous Metal Distribution Transformers in Australia
- 9 February 2009PLP’s New Substation Catalogue Launches 09”
- 16 November 2008PLP - A Major Supplier of Busbar Systems to the Australian Market
- 13 November 2008Single Phase To 3 Phase Converter
- 18 August 2008Bluesky Energy Exhibits it's Solar Products
- 5 June 2008PLP enters the Renewable Energy Market
- 5 May 2008Upcoming Phaser3 Exhibitions
- 24 April 2008Agro Trend Field Day 2008
- 30 November 2007Energy21C 2007 - New Composite Cross Arm and Phaser3 Release
- 12 November 2007Chicago Nights Cabaret
- 27 September 2007Complimentary VORTX Placement Schedule
- 24 September 2007Major Supplier of Busbar Systems to Australian Market
- 10 August 2007PLP Corona Analysis Service
- 23 April 2007Preformed Line Products acquires Belos S.A.
- 30 July 2005Turning the First Soil
- 20 July 2005SSD Field Trial
- 6 July 2005Safety Service Disconnector
- 5 July 2005Energy Australia Recognition
- 1 July 2005PLP wins Aurora Supplier of the Year
- 29 July 2004PLP Embraces Accelerated Product Development
- 19 July 2004Turnkey Substation Anchors
- 6 July 2004Fibre to the Home
- 4 July 2004PLP's New Operation in Asia
- 21 October 2002Dedicated Queensland Sales Office in Brisbane
- 10 October 2002PLP Wins Export Award AEEMA
- 7 September 2002Country Energy says Thanks
- 3 September 2002PLP Awarded for Excellence
- 23 August 2002PLP Celebrates 40 Years
- 7 August 2002Mobile Training with PLP
- 26 December 2001PLP-100% Australian
- 25 December 2001D2001 Exhibition
- 20 August 2001PLP Re-Invest in Australian Manufacturing
- 15 August 2001Molong Substation
- 4 August 2001PLP-a growing success in Asia
- 25 November 1999New Product - Coyote Runt fibre optic closure
- 18 November 1999PLP's KGK Lasco drop forge hammer
- 12 November 1999Advance Energy and PLP
- 6 July 1999Pro-Engineer Proves its worth
- 2 July 1999New Product- ABC Service Terminations
- 1 July 1999PLP Enters the Data Communications Market